|
These elements are supplied open and ready to be sticked.
Their preparation is very easy. First of all, clean the remaining dust on the profiling with a brush. Moisten the profiling with a wet brush and stick with a special resin endowed with a spout. Assemble the element wrapping it with adhesive paper. Clean the remaining resin and let harden for at least 2 hours.
The assembled element must be installed on metal structures and fixed with screws.
The treatment of plastering of the junctions is performed as in normal ceiling.
|
|
|
ONESTEP PROFILGIPS ml. 3,00
OPENTOP ml. 3,00
|
|
![]() |
TWO-STEPS PROFILGIPS ml. 3,00
THREE-STEPS PROFILGIPS ml. 3,00
|